Monthly Archives: August 2012

Last Update

Sunday 04-14-2013

New Ring Road, Tirana Elbasan Road

Construction Cost: N/AContract Period: 07/2009 – 06/2010 Project consists in detailed design of a 6-lane wide highway, 2 through-traffic lanes + 1 emergency lane in each direction. The highway is 12 km

Detailed Design of Ternova Hydropower

Client: Teodori 2003 sh.p.k (Albanian and Canadian)\r\nPartners: N/A\r\nContract Period: 04/2011-01/2012 \r\n Project consists in detailed design of the components of the Hydropower Plant of Ternova located in Bulqize with installed power of

Detailed Design of the Highway: Tirana ‐ Elbasan Road 

Client: General Roads Directorate of Albania Partners: GEOSAT Contract Period: 03/2011 – 06/2011 Project consists in detailed design of a 6-lane wide highway, 2 through-traffic lanes + emergency lane in each direction. The highway