Detailed Design of Ternova Hydropower

Client: Teodori 2003 sh.p.k (Albanian and Canadian)\r\nPartners: N/A\r\nContract Period: 04/2011-01/2012


Project consists in detailed design of the components of the Hydropower Plant of Ternova located in Bulqize with installed power of 8.3 MW and predicted annual power production of 43 million kWh. ICE is designing about 23km of derivation channels, rising up few existing dams of height up to 10m, reconstruction of dams with height 40m, design of 3 hydraulic tunnels, structural design of powerhouse detailed design of 5km of penstock with diameter up to 700mm and maximum head 1000m, about 30km of access roads, about 10km of power supply line and other temporary works. Project is going on.\r\nSupervision services will be provided during construction period.