HPP, Lepenci 1&3

Project consists in feasibility study of the Hydropower Plant located in Kosovo Lepenci River, with installed power of 10+8.5 MV and annual estimated energy production of 40 and 41 GWh/year. The components handled technically by ICE are: water intake, surge tank, penstock 8800 and 9300m long with 2500 and 2000mm diameter, powerhouse, tailrace, substation, energy model, and temporary works such as access roads and site camp. Detailed design services will be provided under another assignment.