DESIGN OF STORM WATER, SEWERAGE SYSTEMS AND WASTEWATER TREATMENT PLANT FOR TAP COMPRESSOR STATION ACS03 IN FIER, ALBANIA

Investor: Trans Adriatic Pipeline AG Albania
Client: Asprofos & CM Engineering (Greece)
Construction Cost: Not Public
Contract Period: 06/2015 -12/2015
The Trans Adriatic Pipeline (TAP) has a key role to play in securing the long-term diversity and security of Europe’s energy supply. This pipeline will connect Western and South-Eastern Europe to the abundant new gas sources in the Caspian basin and beyond. Project consists in design (Drawings, Calculations. Technical Reports and Descriptions etc.) of storm water system, sewerage system and wastewater treatment plant for the Compressor Station ACS03 in Fier, Albania with an approximate area of 15 ha. The main services provided within this Project were: Storm water Drainage System Hydraulic Calculation, Sanitary Sewage Hydraulic Calculations, Surrounding Area Layout of Sanitary Sewage System, Surrounding Area Diagram of Sanitary Sewage System, Waste Water Treatment Plant Technical Report and Calculation.