Licensed Designer and Permitting Engineering Services for TAP Pipeline (211 km) and 9 Block Valve Stations (BVS) in Albania

Investor: Trans Adriatic Pipeline AG
Client: Asprofos & CM Engineering
Partners: N/A
Construction Cost: Not Public
Contract Period: 07/2015 – 02/2016
The Trans Adriatic Pipeline (TAP) will connect Western and South-Eastern Europe to the abundant new gas sources in the Caspian basin and beyond. Project consists in the preparation and the introduction of the infrastructure/building permit application documents related to the TAP Pipeline of 211 km and 9 BVS stations in Albania. The scope of work cover all required TAP Pipeline of 211 km and 9 BVS of the onshore pipeline part in Albania and the 211 km TAP Pipeline and 9 BVS related infrastructures. The main services provided within this Project were: Review, Preparation and organization of some infrastructure / building permit application documents, Translation, Verification, Fire safety protection concept.