Preparation of Feasibility Study of Tepelena Bypass and Preparation of Detailed Design, Tender Documents and Supervision of Construction for Gjirokaster and Tepelena Bypasses – EUROPEAID/126332/C/SER/AL

Client: European Commission
Partners: BONIFICA (Italy)
Construction Cost: 25 Million Euro
Contract Period: 10/2008 – 10/2011
Project is for:
– Preparation of the feasibility study of Tepelena bypass of total length of 10km including traffic analysis, environmental impact, economic analysis, obtaining the existing situation, geotechnical and soil investigation, surveying of terrain, utilities investigation and design, road alignment design, Review of previous feasibility study of Gjirokaster bypass of total length of 10km, especially for the environmental assessment point of view;
– Preparation of detailed design for both bypasses structure design including 3 major bridge, culverts and retaining structures and possibly 1 tunnel 1.2 km long;
– Preparation of tender documents for construction and supervision services during construction of the works. ICE provided 3 key personnel for this project. Supervision phase has not started yet.