Structural Design of a Kindergarten with Gym, Austria

Client: Verein Phonix fur bildung, kultur und sport (Austria)
Partners: N/A
Construction Cost: 1.5 M USD
Contract Period: 04/2013-06/2013
Project consists in detailed structural design of a 4-storey, 3800 sq.m reinforced concrete frame building, reinforced concrete Mat foundation, partially made of reinforced concrete or hollow plank ceiling in the roof.