Bankable Feasibility Study of 2 HPP, Kosovo

Client: Not Public
Construction Cost: 32,000,000 USD
Contract Period: 05/2014-12/2014
Assignment consists in preparation of feasibility study of 2 Hydropower Plants to be financed by Islamic Development Bank, in Kosovo, with total installed power of 19.2 MW and annual estimated energy production of 90 GWh. ICE designed and evaluated: Financial Model, Hydrological Study, Energy Model, Hydraulic Components such as: water intakes, surge tanks, penstocks, powerhouses, tailraces, substations, tunnels, Temporary Works such as access roads and site camps, Expropriation Evaluation, Transmission Lines and Cost Estimates.