Bankable Feasibility Study of HPP 3, Albania

Client: Not Public
Partners: N/A
Construction Cost: 9,700,000 USD
Contract Period: 03/2013-04/2014
Project consists in feasibility study of the Hydropower Plant located in Elbasan, with installed power of 3.7 MW and annual estimated energy production of 17.2 million kWh. The components handled technically by ICE are: water intake, surge tank, penstock 5430m long with 2300 and 2400mm dia, powerhouse, tailrace, substation, energy model, and temporary works such as access roads and site camp. Detailed design services will be provided under another assignment.