Bankable Feasibility Study of Zall-Bulqiza HPP, Albania

Client: Teodori 2003 sh.p.k (Albanian and Canadian)
Partners: Hydro Énergie FV Inc. (Canada)
Construction Cost: 10 000 000 USD
Contract Period: 11/2012-02/2013
Project consists in feasibility study of the Hydropower Plant of Zall Bulqiza located in Bulqize with installed power of 5.4 MW and annual estimated energy production of 25 million kWh. The components handled technically by ICE are: overflow weir, lateral water intake, settling basin, 10km derivation channel including a tunnel 200m long, forebay, penstock of 1600mm dia, powerhouse, tailrace, substation, and temporary works such as access roads and site camp.
Detailed design services will be provided under another assignment.