Review of Feasibility Study of Shala HPP, Albania

Client: 3POWER (Switzerland)
Construction Cost: 329,000,000 USD
Contract Period: 02/2013-03/2014
Assignment consists in review and evaluation of feasibility study of the 6 Hydropower Plants of Shala river cascade located in Shkodra, with total installed power of 127.6 MW and annual estimated energy production of 530 GWh. The subjects revised by ICE are: Financial Model, Hydrological Study, Energy Model, Hydraulic Components such as: water intakes, surge tanks, penstocks, powerhouses, tailraces, substations, tunnels, Temporary Works such as 100km of access roads and site camps, Expropriation Evaluation, Transmission Lines and Cost Estimates.